page 1  (43 pages)
2to next section

Analyzing a Pre Run Time Scheduling Algorithm

and Precedence Graphs1

Gerhard Fohler

Institut f?ur Technische Informatik
Technische Universit?at Wien
Austria

[email protected]

Internal Report 7-GTB

September 15, 1992

Institut f?ur Technische Informatik
Technische Universit?at Wien
Treitlstrasse 3/182/1
A-1040 Wien
Austria

Phone: (43) 222-58801-8181
Fax: (43) 222-569149

LIMITED DISTRIBUTION NOTICE: This report is submitted for publication and will probably be copyrighted if accepted for publication. It has been issued as a Research Report only for early dissemination of its contents. In view of the transfer of copyright to the outside publisher, its distribution should be limited to peer communications and specific requests.
1This work was supported by the Austrian Science Foundation (Fonds zur F?orderung der wissenschaftlichen Forschung) under contract P8002-TEC.