Cover Image
close this bookFinal Report on a Study for the Development of Mini-Hydro Power Plants in Zanzibar - Phase 2 (COSTECH, 1999, 64 p.)
View the document(introduction...)
View the documentABSTRACT
View the documentACKNOWLEDGEMENT
View the documentNOMENCLATURE
Open this folder and view contents1. INTRODUCTION
View the document2. OBJECTIVES
Open this folder and view contents3. LITERATURE REVIEW
Open this folder and view contents4. METHODOLOGY
Open this folder and view contents5. ASSESSMENT OF HYDROPOWER POTENTIAL IN PEMBA
Open this folder and view contents6. DETERMINING GENERATION CAPACITY
Open this folder and view contents7. LOAD DEMAND DETERMINATION
Open this folder and view contents8. DISCUSSION OF RESULTS
View the document9. CONCLUSIONS
View the document10. RECOMMENDATIONS
View the documentREFERENCES
View the documentAPPENDIX A1
View the documentAPPENDIX A2
View the documentAPPENDIX A3
View the documentAPPENDIX A4
View the documentAPPENDIX B1
View the documentAPPENDIX B2
View the documentAPPENDIX B3
View the documentAPPENDIX B4
View the documentAPPENDIX C1: VIEW AT CHAMANANGWE RIVER
View the documentAPPENDIX C2: VIEW AT PIKI RIVER